Novtriq Engineering MCP
An official MCP server from Novtriq providing 27 deterministic engineering calculators and regulatory-compliance checkers for the built environment, covering data centres, building energy, UK/EU/UAE regulations, structural design, and cybersecurity.
Endpoint and access
No sign-in to connect and list tools. Individual tools may still need a vendor account, credentials, or permissions; check the documented prerequisites.
https://api.novtriq.tech/mcpWhat its tools do
27 tools, grouped by the hints the server advertises. Hints are self-declared, not verified behavior.
Not annotated (27)
calculate_puecheck_nis2_readinessassess_epbd_scoreestimate_cooling_loadcheck_uae_bim_compliancecheck_uae_cybersecuritycheck_grid_feasibility_uaeget_technical_dd_quotecalculate_carbonthermal_loadroi_calculatorbuilding_carbon_footprintbuilding_readinesseurocode_beam_designereurocode_column_checkereu_cost_benchmarkingdgnb_bim_readinesscontractor_vettingdigital_renovation_passportuk_planning_checkerpart_s_evpart_o_overheatingmees_checkerheatpump_heatlosseed_datacentre_packuae_climate_ghgsap_sbem_precheck
Checks and signals
Each line is separate evidence, not a trust score.
- Passed Endpoint answered the live check ·
- Passed Official MCP Registry namespace is tied to novtriq.tech ·
- Passed Endpoint is on the registry namespace domain ·
- Availability 1 of 1 checks passed in 30 days
What you can do with it
- Calculate Power Usage Effectiveness (PUE) for data centres
- Assess EU building energy-performance compliance (EPBD)
- Check UK Minimum Energy Efficiency Standard (MEES) for lettable properties
- Verify UAE BIM mandate applicability and cybersecurity compliance
Source and maintenance
Protocol and capabilities
- Server
- novtriq-engineering 3.0.0
- MCP protocol negotiated in check
- 2025-06-18
- Tools
- 27 advertised
- Resources
- Not advertised
- Resource templates
- Not advertised
- Prompts
- Not advertised
{
"tools": {}
}Tools
27 advertised
calculate_pue
Calculate Power Usage Effectiveness (PUE) for a data centre or server room. Returns PUE score, efficiency rating, annual cost estimate, and engineering recommendations.
{
"type": "object",
"required": [
"it_load_kw",
"cooling_kw",
"ups_losses_kw",
"lighting_kw"
],
"properties": {
"cooling_kw": {
"type": "number",
"description": "Total cooling system power in kW. Example: 200"
},
"it_load_kw": {
"type": "number",
"description": "IT equipment power draw in kW. Example: 500"
},
"lighting_kw": {
"type": "number",
"description": "Lighting power in kW. Example: 1.5"
},
"ups_losses_kw": {
"type": "number",
"description": "UPS and power distribution losses in kW. Example: 25"
}
}
}check_nis2_readiness
Assess NIS2 Directive (EU 2022/2555) compliance readiness. Returns compliance score (0-18), maturity level, estimated fine exposure, and prioritised remediation actions.
{
"type": "object",
"required": [
"has_ciso",
"has_ot_policy",
"has_board_reporting",
"has_asset_inventory",
"has_network_segmentation",
"has_ir_plan",
"has_24h_reporting",
"has_supplier_assessment",
"has_ot_monitoring",
"organisation_size",
"sector"
],
"properties": {
"sector": {
"type": "string",
"description": "e.g. energy, transport, healthcare, banking"
},
"has_ciso": {
"type": "boolean"
},
"has_ir_plan": {
"type": "boolean"
},
"has_ot_policy": {
"type": "boolean"
},
"has_24h_reporting": {
"type": "boolean"
},
"has_ot_monitoring": {
"type": "boolean"
},
"organisation_size": {
"enum": [
"essential",
"important",
"other"
],
"type": "string"
},
"has_asset_inventory": {
"type": "boolean"
},
"has_board_reporting": {
"type": "boolean"
},
"has_supplier_assessment": {
"type": "boolean"
},
"has_network_segmentation": {
"type": "boolean"
}
}
}assess_epbd_score
Assess EU EPBD (2024) compliance. Returns compliance score, renovation cost estimate, deadline pressure, and priority retrofit measures.
{
"type": "object",
"required": [
"building_type",
"year_built",
"current_epc",
"heating_system",
"has_solar_pv",
"floor_area_m2",
"country"
],
"properties": {
"country": {
"type": "string",
"description": "e.g. germany, france, netherlands, ireland, uk"
},
"year_built": {
"type": "integer"
},
"current_epc": {
"enum": [
"A",
"B",
"C",
"D",
"E",
"F",
"G"
],
"type": "string"
},
"has_solar_pv": {
"type": "boolean"
},
"building_type": {
"type": "string",
"description": "e.g. office, residential, retail, school, hospital"
},
"floor_area_m2": {
"type": "number"
},
"heating_system": {
"type": "string",
"description": "gas_boiler, heat_pump, district_heating, electric, oil_boiler, biomass"
}
}
}estimate_cooling_load
Estimate cooling load using CIBSE Guide B2 / ASHRAE methodology. Returns required capacity, installed capacity with redundancy, system recommendation, and annual energy.
{
"type": "object",
"required": [
"space_type",
"floor_area_m2",
"it_load_kw",
"occupancy_persons",
"climate_zone",
"redundancy"
],
"properties": {
"it_load_kw": {
"type": "number",
"description": "Required for data_centre/server_room. Set 0 for others."
},
"redundancy": {
"enum": [
"N",
"N+1",
"2N"
],
"type": "string"
},
"space_type": {
"enum": [
"office",
"data_centre",
"server_room",
"retail",
"industrial"
],
"type": "string"
},
"climate_zone": {
"enum": [
"northern_eu",
"central_eu",
"southern_eu",
"uk",
"uae_gcc"
],
"type": "string"
},
"floor_area_m2": {
"type": "number"
},
"occupancy_persons": {
"type": "integer"
}
}
}check_uae_bim_compliance
Check UAE BIM mandate applicability (Dubai Circular 196, Abu Dhabi DMT, Sharjah). Returns mandate status, compliance score, required LOD, and submission checklist.
{
"type": "object",
"required": [
"building_area_m2",
"building_floors",
"emirate",
"building_type",
"has_bim_model",
"bim_software",
"ifc_export",
"has_bep"
],
"properties": {
"emirate": {
"enum": [
"dubai",
"abu_dhabi",
"sharjah",
"other"
],
"type": "string"
},
"has_bep": {
"type": "boolean"
},
"ifc_export": {
"type": "boolean"
},
"bim_software": {
"type": "string",
"description": "e.g. Revit 2024"
},
"building_type": {
"enum": [
"residential",
"commercial",
"healthcare",
"government",
"mixed"
],
"type": "string"
},
"has_bim_model": {
"type": "boolean"
},
"building_floors": {
"type": "integer"
},
"building_area_m2": {
"type": "number"
}
}
}check_uae_cybersecurity
Assess UAE cybersecurity regulatory compliance (NESA IAS, Dubai ISR, CBUAE, TDRA). Returns applicable framework, compliance score, critical gaps, and mandatory controls.
{
"type": "object",
"required": [
"organisation_type",
"emirate",
"has_isms",
"has_incident_response",
"has_vulnerability_assessment",
"has_third_party_audit",
"has_data_classification",
"is_cloud_hosted"
],
"properties": {
"emirate": {
"type": "string",
"description": "dubai, abu_dhabi, sharjah, federal, other"
},
"has_isms": {
"type": "boolean"
},
"is_cloud_hosted": {
"type": "boolean"
},
"organisation_type": {
"enum": [
"government",
"critical_infrastructure",
"financial",
"telecom",
"other"
],
"type": "string"
},
"has_incident_response": {
"type": "boolean"
},
"has_third_party_audit": {
"type": "boolean"
},
"has_data_classification": {
"type": "boolean"
},
"has_vulnerability_assessment": {
"type": "boolean"
}
}
}check_grid_feasibility_uae
Assess UAE grid connection feasibility (DEWA/ADDC/SEWA/FEWA). Returns feasibility score, connection timeline, recommended voltage, substation requirement, and next steps.
{
"type": "object",
"required": [
"site_location",
"power_requirement_mw",
"voltage_level",
"intended_use",
"has_existing_supply",
"target_completion_year"
],
"properties": {
"intended_use": {
"enum": [
"data_centre",
"commercial",
"industrial",
"mixed"
],
"type": "string"
},
"site_location": {
"enum": [
"dubai",
"abu_dhabi",
"sharjah",
"ajman",
"other"
],
"type": "string"
},
"voltage_level": {
"enum": [
"LV",
"MV",
"HV"
],
"type": "string"
},
"has_existing_supply": {
"type": "boolean"
},
"power_requirement_mw": {
"type": "number"
},
"target_completion_year": {
"type": "integer"
}
}
}get_technical_dd_quote
Generate an indicative Technical Due Diligence (TDD) fee estimate. Returns preliminary and full DD fee ranges (GBP), turnaround days, and contact CTA.
{
"type": "object",
"required": [
"building_type",
"gross_area_m2",
"transaction_type",
"disciplines",
"geography",
"timeline_weeks"
],
"properties": {
"geography": {
"enum": [
"uk",
"eu",
"uae",
"gcc"
],
"type": "string"
},
"disciplines": {
"type": "array",
"items": {
"enum": [
"structural",
"mep",
"compliance",
"energy",
"nis2"
],
"type": "string"
}
},
"building_type": {
"type": "string",
"description": "office, data_centre, industrial, retail, residential, mixed_use, hotel, warehouse, healthcare"
},
"gross_area_m2": {
"type": "number"
},
"timeline_weeks": {
"type": "integer"
},
"transaction_type": {
"enum": [
"acquisition",
"disposal",
"refinancing",
"planning"
],
"type": "string"
}
}
}calculate_carbon
Calculate operational + embodied carbon and net-zero gap (CIBSE TM65 / RICS WLCA). Returns carbon intensity, benchmark, and prioritised reduction measures with payback.
{
"type": "object",
"required": [
"floor_area_m2",
"building_type",
"country"
],
"properties": {
"country": {
"type": "string",
"description": "ISO-2: gb, de, fr, nl, es, pl, ro, it, ae, us"
},
"building_type": {
"type": "string",
"description": "office, residential, retail, industrial, hospital, warehouse, hotel"
},
"floor_area_m2": {
"type": "number"
},
"energy_kwh_year": {
"type": "number",
"description": "Measured annual energy; 0 to use benchmark"
},
"construction_year": {
"type": "integer"
}
}
}thermal_load
Thermal Load Estimator for data centres / critical facilities. Returns total heat load, cooling capacity, units, airflow, chiller size, PUE estimate, power density, and a CRAC/CRAH/DLC/immersion comparison.
{
"type": "object",
"required": [
"it_load_kw",
"ups_efficiency_pct",
"room_area_m2",
"cooling_type",
"redundancy",
"ambient_temp_c"
],
"properties": {
"it_load_kw": {
"type": "number"
},
"redundancy": {
"enum": [
"n",
"n1",
"2n"
],
"type": "string"
},
"lighting_kw": {
"type": "number",
"description": "default 5"
},
"cooling_type": {
"enum": [
"crac",
"crah",
"dlc",
"immersion"
],
"type": "string"
},
"room_area_m2": {
"type": "number"
},
"ambient_temp_c": {
"type": "number"
},
"ups_efficiency_pct": {
"type": "number",
"description": "1-99.9"
}
}
}roi_calculator
Engineering ROI calculator. Returns current manual cost, annual saving, net benefit, ROI %, payback months, 3-year NPV and a verdict.
{
"type": "object",
"required": [
"team_size",
"hourly_rate",
"manual_hours",
"efficiency_gain_pct",
"implementation_time_months"
],
"properties": {
"team_size": {
"type": "number"
},
"hourly_rate": {
"type": "number"
},
"manual_hours": {
"type": "number",
"description": "manual hours per week"
},
"software_cost": {
"type": "number",
"description": "annual GBP (default 0)"
},
"efficiency_gain_pct": {
"type": "number",
"description": "<=90"
},
"implementation_time_months": {
"type": "number"
}
}
}building_carbon_footprint
Building carbon footprint (Scope 1/2/3) with CRREM stranding check and embodied carbon. Returns per-scope tCO2e, intensity, CRREM compliance, net-zero gap and priority actions.
{
"type": "object",
"required": [
"building_type",
"floor_area_m2",
"location",
"year_built"
],
"properties": {
"location": {
"enum": [
"uk",
"eu",
"uae"
],
"type": "string"
},
"occupancy": {
"type": "number"
},
"year_built": {
"type": "integer"
},
"refrigerant": {
"enum": [
"hfc",
"hfo",
"none"
],
"type": "string"
},
"gas_kwh_year": {
"type": "number"
},
"building_type": {
"enum": [
"office",
"retail",
"industrial",
"datacentre",
"healthcare",
"education",
"residential"
],
"type": "string"
},
"elec_kwh_year": {
"type": "number"
},
"floor_area_m2": {
"type": "number"
},
"heat_kwh_year": {
"type": "number"
},
"renewable_pct": {
"type": "number"
}
}
}building_readiness
Building Readiness assessment for change-of-use / conversion. Returns a 0-100 readiness score, project complexity, four domain scores (structural, MEP, compliance, digital/BIM) with RAG, and recommendations.
{
"type": "object",
"required": [
"current_use",
"proposed_use",
"year_built",
"structure",
"floors",
"condition",
"location",
"bim"
],
"properties": {
"bim": {
"enum": [
"yes",
"partial",
"no"
],
"type": "string"
},
"floors": {
"enum": [
"1-3",
"4-6",
"7-10",
"10+"
],
"type": "string"
},
"location": {
"enum": [
"uk",
"western-eu",
"eastern-eu",
"uae"
],
"type": "string"
},
"condition": {
"enum": [
"good",
"fair",
"poor",
"unknown"
],
"type": "string"
},
"structure": {
"enum": [
"concrete",
"steel",
"masonry",
"timber",
"unknown"
],
"type": "string"
},
"year_built": {
"enum": [
"pre1945",
"1945-1970",
"1970-1990",
"1990-2010",
"post2010"
],
"type": "string"
},
"current_use": {
"enum": [
"office",
"industrial",
"retail",
"residential"
],
"type": "string"
},
"proposed_use": {
"enum": [
"office",
"residential",
"healthcare",
"industrial",
"retail"
],
"type": "string"
}
}
}eurocode_beam_designer
Preliminary Eurocode beam design (steel EC3 / composite / reinforced concrete EC2). Selects a section, computes ULS bending & shear utilisation, SLS deflection, and fire protection. Indicative, not a stamped design.
{
"type": "object",
"required": [
"material",
"config",
"span_m",
"udl_kn_m"
],
"properties": {
"grade": {
"type": "string",
"description": "Steel: s275/s355. Concrete: c2530/c3037/c3545"
},
"config": {
"enum": [
"ss",
"cant",
"cont"
],
"type": "string",
"description": "ss=simply supported, cant=cantilever, cont=continuous 2-span"
},
"span_m": {
"type": "number",
"description": "Span length (m)"
},
"exposure": {
"enum": [
"xc1",
"xc2",
"xc3"
],
"type": "string",
"description": "Concrete exposure class (cover)"
},
"material": {
"enum": [
"steel",
"composite",
"concrete"
],
"type": "string",
"description": "Beam material"
},
"udl_kn_m": {
"type": "number",
"description": "Characteristic uniformly distributed load (kN/m)"
},
"fire_rating": {
"enum": [
"r30",
"r60",
"r90",
"r120"
],
"type": "string",
"description": "Required fire rating"
},
"load_position": {
"type": "number",
"description": "Point-load position as fraction of span 0-1 (default 0.5)"
},
"point_load_kn": {
"type": "number",
"description": "Characteristic point load (kN), optional"
}
}
}eurocode_column_checker
Eurocode axial column buckling check (steel EC3 6.3.1 flexural buckling / RC EC2 5.8 simplified). Returns Ncr, non-dimensional slenderness, reduction factor chi, NRd and utilisation. Indicative, not a stamped design.
{
"type": "object",
"required": [
"axial_load_kn",
"effective_length_m",
"material"
],
"properties": {
"section": {
"type": "string",
"description": "Steel section key, e.g. UC203x203x46 (steel only)"
},
"depth_mm": {
"type": "number",
"description": "RC column depth h (mm), concrete only"
},
"material": {
"enum": [
"S275",
"S355",
"C25",
"C30"
],
"type": "string",
"description": "Section material"
},
"width_mm": {
"type": "number",
"description": "RC column width b (mm), concrete only"
},
"axial_load_kn": {
"type": "number",
"description": "Design axial load NEd (kN)"
},
"buckling_curve": {
"enum": [
"a",
"b",
"c",
"d"
],
"type": "string",
"description": "EC3 buckling curve (steel only)"
},
"eccentricity_mm": {
"type": "number",
"description": "Load eccentricity (mm), optional"
},
"reinforcement_pct": {
"type": "number",
"description": "RC reinforcement ratio % (concrete only)"
},
"effective_length_m": {
"type": "number",
"description": "Effective (buckling) length Lcr (m)"
}
}
}eu_cost_benchmarking
Parametric construction cost benchmark across UK/EU/GCC by country, project type, specification, procurement, programme and BIM. Returns per-m2 and total cost ranges plus a cost breakdown. Indicative parametric estimate, validate against current cost indices.
{
"type": "object",
"required": [
"floor_area_m2",
"country",
"project_type"
],
"properties": {
"bim": {
"enum": [
"yes",
"no"
],
"type": "string"
},
"country": {
"enum": [
"UK",
"DE",
"FR",
"NL",
"ES",
"PL",
"RO",
"BE",
"AT",
"UAE",
"SA"
],
"type": "string",
"description": "Country"
},
"programme": {
"enum": [
"accelerated",
"standard",
"extended"
],
"type": "string"
},
"procurement": {
"enum": [
"traditional",
"db",
"epc",
"ppp"
],
"type": "string"
},
"project_type": {
"enum": [
"office_new",
"resi_new",
"data_centre",
"industrial",
"healthcare",
"retail",
"reno_light",
"reno_deep",
"infrastructure"
],
"type": "string",
"description": "Project type"
},
"floor_area_m2": {
"type": "number",
"description": "Gross floor area (m2), min 100"
},
"specification": {
"enum": [
"basic",
"standard",
"premium",
"ultra"
],
"type": "string"
}
}
}dgnb_bim_readiness
DGNB certification pre-score and BIM (ISO 19650) maturity self-assessment from a 20-question checklist. Returns pre-score, achievable certification level, BIM level, domain breakdown and prioritised gaps. Not a formal DGNB audit.
{
"type": "object",
"required": [
"answers"
],
"properties": {
"answers": {
"type": "object",
"description": "Map of question_id -> yes|partial|no. IDs: lca, materials, water, biodiversity, lcc, flexibility, value_stability, cert_budget, comfort, accessibility, wellbeing, satisfaction, bep, cde, competency, clash, integrated_team, commissioning, documentation, poe"
},
"cert_target": {
"enum": [
"bronze",
"silver",
"gold",
"platinum"
],
"type": "string",
"description": "Target DGNB level"
}
}
}contractor_vetting
NIS2 / EPBD contractor vetting score from a 12-question checklist across financial, technical, cyber (NIS2) and energy (EPBD) categories. Flags blocking (critical) failures and returns recommended additional checks. Not a formal due-diligence report.
{
"type": "object",
"required": [
"answers"
],
"properties": {
"answers": {
"type": "object",
"description": "Map of question_id -> yes|no|unknown. IDs: registered, insurance, no_prosecutions, certifications, references, cvs, cyber_policy, incident_reporting, access_control, assessor_cert, energy_qual, reno_experience"
},
"purpose": {
"enum": [
"nis2",
"epbd",
"general",
"critical"
],
"type": "string",
"description": "Vetting purpose"
}
}
}digital_renovation_passport
EPBD-style staged digital renovation passport: 3-phase roadmap (quick wins, system upgrades, deep renovation) with cost ranges, energy savings and EPC trajectory from current EPC, floor area and heating type. Indicative.
{
"type": "object",
"required": [
"floor_area_m2",
"current_epc",
"heating"
],
"properties": {
"era": {
"type": "string",
"description": "Construction era (label only)"
},
"address": {
"type": "string",
"description": "Building address (label only)"
},
"country": {
"type": "string",
"description": "Country code (e.g. UK, DE)"
},
"heating": {
"enum": [
"gas",
"oil",
"hp",
"district",
"electric",
"biomass"
],
"type": "string",
"description": "Primary heating system"
},
"current_epc": {
"enum": [
"A",
"B",
"C",
"D",
"E",
"F",
"G"
],
"type": "string",
"description": "Current EPC band A-G"
},
"building_type": {
"type": "string",
"description": "Building type (label only)"
},
"floor_area_m2": {
"type": "number",
"description": "Gross floor area (m2)"
}
}
}uk_planning_checker
UK permitted-development (GPDO 2015, England) rules engine for extensions, loft conversions and change of use. Returns a verdict (likely_pd / requires_permission / complex), applicable PD class, conditions and flags (listed building, Article 4, conservation area, AONB). Indicative, verify with the LPA.
{
"type": "object",
"required": [
"property_type",
"proposal"
],
"properties": {
"listed": {
"enum": [
"yes",
"no"
],
"type": "string"
},
"location": {
"enum": [
"england",
"wales",
"scotland",
"ni"
],
"type": "string"
},
"proposal": {
"enum": [
"extension",
"loft",
"outbuilding",
"cou",
"newdwelling",
"subdivision",
"demolition"
],
"type": "string"
},
"article_4": {
"enum": [
"yes",
"no",
"unknown"
],
"type": "string"
},
"use_class": {
"type": "string",
"description": "Existing use class (C3, C1, E, B2, B8, F1, F2, SG)"
},
"proposed_use": {
"type": "string",
"description": "Proposed use class (change of use only); 'same' if unchanged"
},
"property_type": {
"enum": [
"house",
"flat",
"commercial",
"industrial",
"agricultural",
"mixed"
],
"type": "string"
},
"conservation_area": {
"enum": [
"yes",
"no"
],
"type": "string"
},
"extension_depth_m": {
"type": "number",
"description": "Rear extension depth (m), for extension proposals"
},
"national_park_aonb": {
"enum": [
"yes",
"no"
],
"type": "string"
}
}
}part_s_ev
UK Approved Document S 2021 electric-vehicle charge-point requirement calculator for new build and major renovation, residential and non-residential. Returns required charge points, cable routes (1-in-5 for non-residential), minimum power and the applicable cost caps/exemptions. Indicative.
{
"type": "object",
"required": [
"building_type",
"works",
"parking_spaces"
],
"properties": {
"works": {
"enum": [
"new",
"major_renovation"
],
"type": "string"
},
"dwellings": {
"type": "integer",
"description": "Number of dwellings (residential)"
},
"building_type": {
"enum": [
"residential",
"non_residential"
],
"type": "string"
},
"parking_spaces": {
"type": "integer",
"description": "Total associated parking spaces"
},
"covered_car_park": {
"enum": [
"yes",
"no"
],
"type": "string",
"description": "Non-residential covered car park?"
}
}
}part_o_overheating
UK Approved Document O 2021 simplified-method overheating check for new residential: tests maximum glazing area (by orientation, risk zone, cross vs single aspect) and minimum free ventilation area. Returns pass/fail and points to CIBSE TM59 modelling if it fails. Indicative.
{
"type": "object",
"required": [
"location_risk",
"most_glazed_facade",
"floor_area_m2",
"glazing_area_m2"
],
"properties": {
"floor_area_m2": {
"type": "number"
},
"location_risk": {
"enum": [
"high",
"moderate"
],
"type": "string",
"description": "high = listed London postcode districts (AD O Table C1)"
},
"glazing_area_m2": {
"type": "number"
},
"cross_ventilation": {
"enum": [
"yes",
"no"
],
"type": "string"
},
"most_glazed_facade": {
"enum": [
"N",
"E",
"S",
"W"
],
"type": "string"
},
"provided_free_area_m2": {
"type": "number",
"description": "Total openable free area provided (optional)"
}
}
}mees_checker
England & Wales Minimum Energy Efficiency Standard (MEES) check for private rented property. Tests against the in-force EPC E minimum (domestic and non-domestic) and surfaces the PROPOSED (not yet law) EPC C / 2030 uplift as an advisory only. Returns compliance, can-let, cost cap and penalties.
{
"type": "object",
"required": [
"property_type",
"current_epc_band"
],
"properties": {
"property_type": {
"enum": [
"domestic",
"non_domestic"
],
"type": "string"
},
"current_epc_band": {
"enum": [
"A",
"B",
"C",
"D",
"E",
"F",
"G"
],
"type": "string"
}
}
}heatpump_heatloss
Domestic whole-dwelling fabric + ventilation heat-loss estimate for heat pump sizing (BS EN 12831 / MCS), from floor area, storeys, age band, location and glazing. Returns design heat loss (kW), recommended heat pump output, indicative SCOP and annual demand. Typical U-values/SCOP, not measured.
{
"type": "object",
"required": [
"floor_area_m2",
"age_band",
"location"
],
"properties": {
"storeys": {
"type": "integer"
},
"age_band": {
"enum": [
"pre_1900",
"1900_1929",
"1930_1949",
"1950_1966",
"1967_1975",
"1976_1982",
"1983_1990",
"1991_1995",
"1996_2002",
"2003_2006",
"2007_2011",
"2012_2022",
"2023_plus"
],
"type": "string"
},
"location": {
"enum": [
"london",
"birmingham",
"manchester",
"glasgow",
"edinburgh",
"leeds",
"newcastle",
"cardiff",
"belfast",
"plymouth",
"southampton"
],
"type": "string"
},
"flow_temp_c": {
"enum": [
35,
45,
55
],
"type": "integer",
"description": "Emitter flow temperature"
},
"floor_area_m2": {
"type": "number"
},
"air_change_rate": {
"type": "number",
"description": "ACH, default 0.5"
},
"ceiling_height_m": {
"type": "number",
"description": "Default 2.4"
},
"glazing_pct_of_floor": {
"type": "number",
"description": "Default 25"
},
"external_design_temp_c": {
"type": "number",
"description": "Override 99.6% external design temp"
},
"internal_design_temp_c": {
"type": "number",
"description": "Default 21"
}
}
}eed_datacentre_pack
EU Energy Efficiency Directive data-centre reporting pack (Dir (EU) 2023/1791 Art.12 + Del. Reg (EU) 2024/1364). Determines reporting scope (IT power >= 500 kW) and computes the mandated KPIs PUE, WUE, ERF and REF. Note: the regulation mandates reporting, not target values.
{
"type": "object",
"required": [
"it_power_kw",
"total_energy_kwh",
"it_energy_kwh"
],
"properties": {
"it_power_kw": {
"type": "number",
"description": "Installed IT power demand (kW)"
},
"it_energy_kwh": {
"type": "number",
"description": "EIT: IT energy (kWh/yr)"
},
"water_input_m3": {
"type": "number",
"description": "WIN: total water input (m3/yr), for WUE"
},
"reused_heat_kwh": {
"type": "number",
"description": "EREUSE waste heat reused, for ERF"
},
"total_energy_kwh": {
"type": "number",
"description": "EDC: total data-centre energy (kWh/yr)"
},
"renewable_energy_kwh": {
"type": "number",
"description": "ERES-TOT renewable energy consumed, for REF"
}
}
}uae_climate_ghg
UAE Scope 1 + Scope 2 GHG estimate from electricity and gas use, with emirate-specific grid emission factors (Dubai/Abu Dhabi/national) and the Federal Decree-Law No. 11 of 2024 mandatory-reporting context. Grid factors carry base-year/confidence caveats.
{
"type": "object",
"required": [
"emirate",
"electricity_kwh"
],
"properties": {
"gas_m3": {
"type": "number",
"description": "Annual natural gas (m3), alternative to gas_kwh"
},
"emirate": {
"enum": [
"dubai",
"abu_dhabi",
"national"
],
"type": "string"
},
"gas_kwh": {
"type": "number",
"description": "Annual natural gas (kWh)"
},
"electricity_kwh": {
"type": "number",
"description": "Annual grid electricity (kWh)"
}
}
}sap_sbem_precheck
UK SAP 10.3 / SBEM EPC precheck. Maps a known SAP rating (1-100) to its EPC band, and/or computes annual CO2 and primary energy from fuel consumption using validated SAP 10 fuel factors. The official EPC band is cost-based and needs a full SAP/RdSAP assessment.
{
"type": "object",
"required": [],
"properties": {
"sap_rating": {
"type": "number",
"description": "Known SAP rating 1-100 (returns the EPC band)"
},
"floor_area_m2": {
"type": "number",
"description": "For carbon/primary-energy intensity"
},
"annual_energy_kwh": {
"type": "object",
"description": "Map fuel -> kWh/yr. Fuels: mains_gas, grid_electricity, heating_oil, lpg, wood_pellets, wood_logs, wood_chips, biomass_community"
}
}
}Prompts
Not advertised
Resources
Not advertised
90-day uptime
A lightweight connection check about every six hours, sampled on hosts with many listings. It shows the server answered, not that its tools work.
- 2026-11-07: 1 of 1 checks answered
30-day availability
Aggregated from read-only remote checks; this is not a tool-execution or security guarantee.
- Successful checks
- 1 of 1 (100%)
- Average latency
- 828 ms
- 95th percentile latency
- 828 ms
Maintenance history
Public check and source-refresh events. Editorial and ownership records remain private.
- · probe · passed · 828 ms · metadata changed · 27 tool(s)
Connect from your client
Each snippet registers the same endpoint; pick the client you use.
Claude Code
claude mcp add --transport http novtriq-engineering-mcp https://api.novtriq.tech/mcpCodex
codex mcp add novtriq-engineering-mcp --url https://api.novtriq.tech/mcpCursor
{
"mcpServers": {
"novtriq-engineering-mcp": {
"url": "https://api.novtriq.tech/mcp"
}
}
}Cline
{
"mcpServers": {
"novtriq-engineering-mcp": {
"type": "streamableHttp",
"url": "https://api.novtriq.tech/mcp",
"disabled": false
}
}
}VS Code
{
"servers": {
"novtriq-engineering-mcp": {
"type": "http",
"url": "https://api.novtriq.tech/mcp"
}
}
}Gemini CLI
gemini mcp add --transport http novtriq-engineering-mcp https://api.novtriq.tech/mcpClaude Desktop
https://api.novtriq.tech/mcpWindsurf
{
"mcpServers": {
"novtriq-engineering-mcp": {
"serverUrl": "https://api.novtriq.tech/mcp"
}
}
}Let your agent find its tools
Find servers like Novtriq Engineering MCP from your agent. Add Koskamo once to search the index for endpoints, access requirements, and client setup. Public discovery needs no key.
Other developer tools servers
Do you run Novtriq Engineering MCP?
Prove ownership with a DNS record, a well-known file, or your Official MCP Registry entry, and your edits publish immediately. Proofs are re-checked weekly; admins can still hide or remove a listing.