HorizunMsProjectMcp MCP server
A community-built Model Context Protocol server for Microsoft Project scheduling. It allows agents to audit, reschedule, and author project schedules without requiring Java or a Microsoft Project installation. Features include critical-path analysis, DCMA 14-point assessment, verified writes, and BIM 4D bridging, operating as a PMO-style tool that plans, controls, and reports following PMBOK standards.
Package and access
Local package with source-attributed installation metadata. Koskamo does not execute packages during review.
Checks and signals
Each line is separate evidence, not a trust score.
- Popularity 9 GitHub stars
What you can do with it
- Determine the critical path and resource overbooking
- Assess schedule compliance with DCMA 14-point audit
- Write changes back to .mpp or .xer files with verification
- Analyze the impact of schedule slips on finish dates
Source and maintenance
- Last repository push
- Latest release
- v1.6.1
- Maintenance checked
Packages and installation
Source-provided package data. Koskamo has not executed or live-probed this package.
HorizunMsProjectMcp 1.6.1
{
"version": "1.6.1",
"transport": "stdio",
"identifier": "HorizunMsProjectMcp",
"registryType": "nuget",
"registryBaseUrl": "https://api.nuget.org/v3/index.json"
}Tools
Reported by the attributed source; not independently observed by Koskamo.
Maintenance history
Public check and source-refresh events. Editorial and ownership records remain private.
- · repository · passed · metadata changed · updated
- · backfill · recorded · Pre-expansion baseline; unobserved rich metadata remains unknown
Let your agent find its tools
Find servers like HorizunMsProjectMcp from your agent. Add Koskamo once to search the index for endpoints, access requirements, and client setup. Public discovery needs no key.