Enercast MCP
An official MCP server operated by Enercast that allows AI assistants and agents to directly query and cite US natural gas pipeline data, including critical notices, daily supply and demand totals, capacity offline status, and new project lists. It provides both free public tools and subscriber-specific historical data access.
Endpoint and access
No sign-in to connect and list tools. Individual tools may still need a vendor account, credentials, or permissions; check the documented prerequisites.
https://enercast.com/mcpWhat its tools do
9 tools, grouped by the hints the server advertises. Hints are self-declared, not verified behavior.
Checks and signals
Each line is separate evidence, not a trust score.
- Passed Endpoint answered the live check ·
- Passed Official MCP Registry namespace is tied to enercast.com ·
- Passed Endpoint is on the registry namespace domain ·
- Availability 1 of 1 checks passed in 30 days
What you can do with it
- Retrieve scored critical notices for US interstate natural gas pipelines
- Get daily supply and demand category totals with day-over-day changes
- Access the Capacity Offline ledger showing Bcf/d offline and events
- List new pipelines, storage, and LNG export projects
Source and maintenance
Protocol and capabilities
- Server
- enercast 1.0.0
- MCP protocol negotiated in check
- 2025-11-25
- Tools
- 9 advertised
- Resources
- Not advertised
- Resource templates
- Not advertised
- Prompts
- Not advertised
{
"tools": {
"listChanged": false
}
}Server-provided instructions
Untrusted server output shown for inspection. It is not Koskamo guidance and is excluded from knowledge search.
Tools
9 advertised
get_critical_notices — Critical pipeline notices
Current critical notices (force majeure, unplanned outages, maintenance, OFOs, capacity restrictions and their lifts) posted by US interstate natural gas pipelines, as scored by Enercast: severity 1-5, event type, bullish/bearish direction, Bcf/d impact, dates, a short summary and a link to the notice on enercast.com. Free: what enercast.com/notices/ shows, last 7 days, held back 60 minutes.
{
"type": "object",
"properties": {
"sort": {
"enum": [
"newest",
"severity"
],
"type": "string"
},
"limit": {
"type": "integer",
"maximum": 50,
"minimum": 1
},
"since": {
"type": "string",
"description": "ISO date/time; notices updated since then"
},
"pipeline": {
"type": "string",
"description": "Pipeline name or part of it, e.g. \"Transco\", \"Tennessee\", \"EPNG\""
},
"event_type": {
"type": "string",
"description": "e.g. force_majeure, maintenance, outage, ofo, lift"
},
"min_severity": {
"type": "integer",
"maximum": 5,
"minimum": 1,
"description": "Lowest severity to include (default 3)"
}
},
"additionalProperties": false
}{
"title": "Critical pipeline notices",
"readOnlyHint": true,
"openWorldHint": false,
"idempotentHint": true,
"destructiveHint": false
}get_daily_supply_demand — Daily US gas supply & demand
Enercast's daily US natural gas supply and demand totals in Bcf/d for 8 categories (supply/production, LNG feedgas, Canada imports, Mexico exports, LDC citygate, industrial end use, power generation, net storage) from pipeline scheduled quantities, with day-over-day change; plus LNG Canada (modeled estimate). Latest published gas day and up to 30 prior days, as on enercast.com/daily-summary/.
{
"type": "object",
"properties": {
"days": {
"type": "integer",
"maximum": 31,
"minimum": 1,
"description": "Gas days ending at gas_date (default 1)"
},
"category": {
"enum": [
"supply_production",
"lng_feedgas",
"canada_import",
"mexico_export",
"ldc_citygate",
"end_user",
"power_generation",
"storage"
],
"type": "string"
},
"gas_date": {
"type": "string",
"description": "YYYY-MM-DD"
}
},
"additionalProperties": false
}{
"title": "Daily US gas supply & demand",
"readOnlyHint": true,
"openWorldHint": false,
"idempotentHint": true,
"destructiveHint": false
}get_capacity_offline — Pipeline capacity offline
Enercast's Capacity Offline ledger: Bcf/d of US interstate pipeline capacity offline from outages and maintenance, by event (pipeline, facility, dates, reduction), as on enercast.com/calendar/.
{
"type": "object",
"properties": {
"limit": {
"type": "integer",
"maximum": 100,
"minimum": 1
},
"state": {
"enum": [
"active",
"scheduled",
"lifted",
"all"
],
"type": "string",
"description": "default: active and scheduled"
},
"pipeline": {
"type": "string"
}
},
"additionalProperties": false
}{
"title": "Pipeline capacity offline",
"readOnlyHint": true,
"openWorldHint": false,
"idempotentHint": true,
"destructiveHint": false
}get_new_projects — New gas infrastructure projects
Enercast's trackers of new US natural gas pipeline, storage and LNG export projects: status (announced to in service), stated capacity, stated in-service timing, sponsor and states, with a link to each project page. Capacities are as stated by the source.
{
"type": "object",
"required": [
"tracker"
],
"properties": {
"limit": {
"type": "integer",
"maximum": 100,
"minimum": 1
},
"query": {
"type": "string",
"description": "Part of a project or sponsor name"
},
"since": {
"type": "string",
"description": "YYYY-MM-DD"
},
"state": {
"type": "string",
"description": "Two-letter state, e.g. LA"
},
"status": {
"type": "string",
"description": "e.g. Under construction, Approved, In service"
},
"tracker": {
"enum": [
"pipelines",
"storage",
"lng_export"
],
"type": "string",
"description": "pipelines = New Pipelines (/new-capacity/), storage = New Storage, lng_export = New LNG Export"
}
},
"additionalProperties": false
}{
"title": "New gas infrastructure projects",
"readOnlyHint": true,
"openWorldHint": false,
"idempotentHint": true,
"destructiveHint": false
}list_pipelines — Pipelines Enercast monitors
The US interstate natural gas pipelines whose critical notices Enercast monitors, with active notice counts, highest active severity and each pipeline's enercast.com page.
{
"type": "object",
"properties": {
"query": {
"type": "string"
}
},
"additionalProperties": false
}{
"title": "Pipelines Enercast monitors",
"readOnlyHint": true,
"openWorldHint": false,
"idempotentHint": true,
"destructiveHint": false
}get_status — Enercast data freshness
When each Enercast dataset behind these tools was last published, and the update cadence.
{
"type": "object",
"properties": {},
"additionalProperties": false
}{
"title": "Enercast data freshness",
"readOnlyHint": true,
"openWorldHint": false,
"idempotentHint": true,
"destructiveHint": false
}get_notice_history — Notice history (subscribers)
Subscribers (Enercast Institutional or notices plan; sign in or send an API key): the full archive of scored pipeline notices up to 366 days back, with notice text.
{
"type": "object",
"properties": {
"to": {
"type": "string",
"description": "YYYY-MM-DD"
},
"from": {
"type": "string",
"description": "YYYY-MM-DD"
},
"limit": {
"type": "integer",
"maximum": 200,
"minimum": 1
},
"query": {
"type": "string",
"description": "Words in the title"
},
"pipeline": {
"type": "string"
},
"include_text": {
"type": "boolean",
"description": "Include notice text (default false)"
},
"min_severity": {
"type": "integer",
"maximum": 5,
"minimum": 1
}
},
"additionalProperties": false
}{
"title": "Notice history (subscribers)",
"readOnlyHint": true,
"openWorldHint": false,
"idempotentHint": true,
"destructiveHint": false
}get_flow_history — Supply & demand history (Institutional)
Enercast Institutional: daily category or component (e.g. LNG terminal, Canada crossing) totals in Bcf/d, up to 366 days, from pipeline scheduled quantities.
{
"type": "object",
"properties": {
"to": {
"type": "string",
"description": "YYYY-MM-DD"
},
"from": {
"type": "string",
"description": "YYYY-MM-DD"
},
"level": {
"enum": [
"category",
"component"
],
"type": "string"
},
"category": {
"type": "string"
},
"component": {
"type": "string"
}
},
"additionalProperties": false
}{
"title": "Supply & demand history (Institutional)",
"readOnlyHint": true,
"openWorldHint": false,
"idempotentHint": true,
"destructiveHint": false
}get_project_changes — Project change log (Institutional)
Enercast Institutional: the daily change log or dated milestones of the New Pipelines and New Storage trackers, with sources.
{
"type": "object",
"required": [
"tracker"
],
"properties": {
"view": {
"enum": [
"changes",
"milestones"
],
"type": "string"
},
"limit": {
"type": "integer",
"maximum": 200,
"minimum": 1
},
"since": {
"type": "string",
"description": "YYYY-MM-DD"
},
"project": {
"type": "string"
},
"tracker": {
"enum": [
"pipelines",
"storage"
],
"type": "string"
}
},
"additionalProperties": false
}{
"title": "Project change log (Institutional)",
"readOnlyHint": true,
"openWorldHint": false,
"idempotentHint": true,
"destructiveHint": false
}Prompts
Not advertised
Resources
Not advertised
90-day uptime
A lightweight connection check about every six hours, sampled on hosts with many listings. It shows the server answered, not that its tools work.
- 2026-11-28: 4 of 4 checks answered
- 2026-11-29: 4 of 4 checks answered
30-day availability
Aggregated from read-only remote checks; this is not a tool-execution or security guarantee.
- Successful checks
- 1 of 1 (100%)
- Average latency
- 661 ms
- 95th percentile latency
- 661 ms
Maintenance history
Public check and source-refresh events. Editorial and ownership records remain private.
- · probe · passed · 661 ms · metadata changed · 9 tool(s)
Connect from your client
Each snippet registers the same endpoint; pick the client you use.
Claude Code
claude mcp add --transport http enercast-mcp https://enercast.com/mcpCodex
codex mcp add enercast-mcp --url https://enercast.com/mcpCursor
{
"mcpServers": {
"enercast-mcp": {
"url": "https://enercast.com/mcp"
}
}
}Cline
{
"mcpServers": {
"enercast-mcp": {
"type": "streamableHttp",
"url": "https://enercast.com/mcp",
"disabled": false
}
}
}VS Code
{
"servers": {
"enercast-mcp": {
"type": "http",
"url": "https://enercast.com/mcp"
}
}
}Gemini CLI
gemini mcp add --transport http enercast-mcp https://enercast.com/mcpClaude Desktop
https://enercast.com/mcpWindsurf
{
"mcpServers": {
"enercast-mcp": {
"serverUrl": "https://enercast.com/mcp"
}
}
}Let your agent find its tools
Find servers like Enercast MCP from your agent. Add Koskamo once to search the index for endpoints, access requirements, and client setup. Public discovery needs no key.
Other data and analytics servers
Do you run Enercast MCP?
Prove ownership with a DNS record, a well-known file, or your Official MCP Registry entry, and your edits publish immediately. Proofs are re-checked weekly; admins can still hide or remove a listing.