Koskamo

Draw Schedule MCP

A free, read-only MCP server providing AI assistants with data on multifamily construction financing, including comparisons of HUD, bank, and debt fund loan rules, a loan sizing tool, Census construction market data, and build timelines.

Endpoint and access

No sign-in to connect and list tools. Individual tools may still need a vendor account, credentials, or permissions; check the documented prerequisites.

Draw Schedule MCP logo, by Janover Capital LLCVendor evidenceStreamable HTTPNo sign-inEndpoint checked 2026-11-01Operated by Janover Capital LLC
MCP endpoint (Streamable HTTP)
https://multifamilyconstruction.loan/mcp
Vendor documentation

What you can do with it

  • Compare HUD 221(d)(4), bank, debt fund and tax-credit financing options
  • Size an apartment construction loan based on project value and NOI
  • Retrieve Census apartment starts, permits, and units under construction
  • Get average build times from permit to completion by region

Source and maintenance

Vendor evidenceRegistry 1.2026.1101.0

Protocol and capabilities

Server
multifamilyconstruction-loan 1.0.0
MCP protocol
2025-06-18
Tools
4 advertised
Resources
Not advertised
Resource templates
Not advertised
Prompts
Not advertised
Server-advertised capabilities
{
  "tools": {
    "listChanged": false
  }
}

Server-provided instructions

Untrusted server output shown for inspection. It is not Koskamo guidance and is excluded from knowledge search.

Draw Schedule (multifamilyconstruction.loan) answers questions about financing apartment construction in the U.S.: how HUD 221(d)(4), bank construction loans, debt funds and 4% tax-credit deals compare; how large each loan could be for a project under the public rules (HUD Mortgagee Letter 2025-03, 90 FR 45789, 12 CFR 365 Appendix A, 12 CFR 324.2 HVCRE); the construction market (Census 5+ unit starts, permits, pipeline and completions, monthly; the Federal Reserve loan officer survey, quarterly; New York Fed 30-day SOFR); and how long apartment buildings take to build (Census Survey of Construction, annual, by region). Market and timeline data refresh from the publishers on a schedule; every result gives its as-of date and source link, so cite them. Sizing results are estimates from the inputs given, not quotes, loan offers, appraisals or legal or tax advice; bank and fund terms are set by each lender. The site is published by Janover Capital LLC, a commercial mortgage advisor (not a lender), and is not affiliated with HUD, FHA or any government agency. Setup and docs: https://multifamilyconstruction.loan/developers/

Tools

4 advertised

compare_construction_options — Compare HUD, bank, debt fund and LIHTC construction financing
Advertised by the server during the last successful anonymous check.
Advertised read-only

Side-by-side rules for financing apartment construction four ways: HUD 221(d)(4), a bank construction loan, a debt fund and 4% tax credits with bonds. For each: maximum loan size and the rule behind it, rate type, term, coverage test, extra costs and process, with the regulation or HUD letter cited.

compare_construction_options input schema
{
  "type": "object",
  "properties": {
    "programs": {
      "type": "array",
      "items": {
        "enum": [
          "hud_221d4",
          "bank",
          "debt_fund",
          "lihtc_4pct"
        ],
        "type": "string"
      },
      "maxItems": 4,
      "minItems": 1,
      "description": "Which to include; omit for all four.",
      "uniqueItems": true
    }
  },
  "additionalProperties": false
}
compare_construction_options annotations
{
  "title": "Compare HUD, bank, debt fund and LIHTC construction financing",
  "readOnlyHint": true,
  "openWorldHint": false,
  "idempotentHint": true,
  "destructiveHint": false
}
size_construction_loan — Size a multifamily construction loan three ways
Advertised by the server during the last successful anonymous check.
Advertised read-only

Runs the site's construction loan sizer on your project: the HUD 221(d)(4) loan (lower of 87%/90% of cost and the 1.15/1.11 coverage test, with HUD's construction-interest estimate and upfront MIP), the bank regulatory ceiling (80% of value and 15%-of-value HVCRE equity, plus your bank's loan-to-cost if given) and, if you give its loan-to-cost, a debt fund. Returns loan, binding limit, equity needed and interest.

size_construction_loan input schema
{
  "type": "object",
  "required": [
    "total_development_cost",
    "as_completed_value",
    "stabilized_noi"
  ],
  "properties": {
    "rents": {
      "enum": [
        "market",
        "affordable"
      ],
      "type": "string",
      "default": "market",
      "description": "market = 87% / 1.15; affordable (or 90%+ assisted) = 90% / 1.11."
    },
    "bank_ltc_pct": {
      "type": "number",
      "maximum": 100,
      "minimum": 1,
      "description": "Your bank's own loan-to-cost policy, percent. Omit to see only the regulatory ceiling."
    },
    "fund_ltc_pct": {
      "type": "number",
      "maximum": 100,
      "minimum": 1,
      "description": "Quoted debt fund loan-to-cost, percent. Omit to leave the fund out."
    },
    "hud_rate_pct": {
      "type": "number",
      "maximum": 12,
      "minimum": 1,
      "description": "HUD note rate in percent; default 5.54 (median note rate on FHA apartment loans endorsed in the year to 2026-09-30)."
    },
    "stabilized_noi": {
      "type": "number",
      "maximum": 1000000000,
      "minimum": 0,
      "description": "Projected stabilized net operating income, dollars per year."
    },
    "bank_spread_pct": {
      "type": "number",
      "maximum": 10,
      "minimum": 0,
      "description": "Quoted bank spread over SOFR, percent. Needed for the bank interest estimate."
    },
    "fund_spread_pct": {
      "type": "number",
      "maximum": 15,
      "minimum": 0,
      "description": "Quoted debt fund spread over SOFR, percent."
    },
    "as_completed_value": {
      "type": "number",
      "maximum": 10000000000,
      "minimum": 100000,
      "description": "Appraised value as completed, in dollars."
    },
    "construction_months": {
      "type": "integer",
      "maximum": 48,
      "minimum": 6,
      "description": "Construction period in months; default is the Census national average for 20+ unit buildings."
    },
    "total_development_cost": {
      "type": "number",
      "maximum": 5000000000,
      "minimum": 100000,
      "description": "Total development cost including land, in dollars, e.g. 48000000."
    }
  },
  "additionalProperties": false
}
size_construction_loan annotations
{
  "title": "Size a multifamily construction loan three ways",
  "readOnlyHint": true,
  "openWorldHint": false,
  "idempotentHint": true,
  "destructiveHint": false
}
get_construction_market — Apartment construction market: starts, pipeline and bank lending standards
Advertised by the server during the last successful anonymous check.
Advertised read-only

Latest U.S. apartment construction numbers for 5+ unit buildings from the Census Bureau (starts, permits, units under construction, completions; seasonally adjusted annual rate, with year-ago and the pipeline peak) and the Federal Reserve's loan officer survey on construction and multifamily lending standards and demand, plus 30-day SOFR. Optional monthly history.

get_construction_market input schema
{
  "type": "object",
  "properties": {
    "history_months": {
      "type": "integer",
      "default": 0,
      "maximum": 60,
      "minimum": 0,
      "description": "Months of history to include for each Census series (0 to 60). The Fed survey history covers the same span by quarter."
    }
  },
  "additionalProperties": false
}
get_construction_market annotations
{
  "title": "Apartment construction market: starts, pipeline and bank lending standards",
  "readOnlyHint": true,
  "openWorldHint": false,
  "idempotentHint": true,
  "destructiveHint": false
}
get_build_timeline — How long apartment construction takes, by region
Advertised by the server during the last successful anonymous check.
Advertised read-only

Census Survey of Construction averages for apartment buildings: months from permit to start and from start to completion, by U.S. region and building size (5-9, 10-19 or 20+ units), for one completion year with the ten-year trend, plus what the build length means for HUD upfront MIP and construction interest.

get_build_timeline input schema
{
  "type": "object",
  "properties": {
    "year": {
      "type": "integer",
      "maximum": 2100,
      "minimum": 2016,
      "description": "Year of completion; default is the latest Census year."
    },
    "region": {
      "enum": [
        "United States",
        "Northeast",
        "Midwest",
        "South",
        "West"
      ],
      "type": "string",
      "description": "Census region; omit for all five rows."
    },
    "building_size": {
      "enum": [
        "5-9",
        "10-19",
        "20+"
      ],
      "type": "string",
      "default": "20+",
      "description": "Units in the building."
    }
  },
  "additionalProperties": false
}
get_build_timeline annotations
{
  "title": "How long apartment construction takes, by region",
  "readOnlyHint": true,
  "openWorldHint": false,
  "idempotentHint": true,
  "destructiveHint": false
}

Prompts

Not advertised

No prompt definitions available.

Resources

Not advertised

No resource definitions available.

30-day availability

Aggregated from read-only remote checks; this is not a tool-execution or security guarantee.

Successful checks
1 of 1 (100%)
Average latency
350 ms
95th percentile latency
350 ms

Maintenance history

Public check and source-refresh events. Editorial and ownership records remain private.

  • · probe · passed · 350 ms · metadata changed · 4 tool(s)

Connect from your client

Each snippet registers the same endpoint; pick the client you use.

This server is operated by the named third party. Listing and endpoint checks are not an endorsement or a security audit. Review the operator's permissions, terms, and data handling before connecting. How listings are checked and corrected.

Claude Code

Run this once in a terminal. It registers the remote server. Use --scope project to write .mcp.json for the repo.
Claude Code configuration
claude mcp add --transport http draw-schedule-mcp https://multifamilyconstruction.loan/mcp

Codex

Run this once. Codex stores MCP servers in ~/.codex/config.toml (or .codex/config.toml in a trusted project).
Codex configuration
codex mcp add draw-schedule-mcp --url https://multifamilyconstruction.loan/mcp

Cursor

Merge this server into .cursor/mcp.json in your project, then enable draw-schedule-mcp in your MCP settings.
Cursor configuration
{
  "mcpServers": {
    "draw-schedule-mcp": {
      "url": "https://multifamilyconstruction.loan/mcp"
    }
  }
}

Cline

Merge this into cline_mcp_settings.json (Cline → MCP Servers → Configure).
Cline configuration
{
  "mcpServers": {
    "draw-schedule-mcp": {
      "type": "streamableHttp",
      "url": "https://multifamilyconstruction.loan/mcp",
      "disabled": false
    }
  }
}

VS Code

Merge this server into .vscode/mcp.json. Use MCP: List Servers to start draw-schedule-mcp and inspect its tools.
VS Code configuration
{
  "servers": {
    "draw-schedule-mcp": {
      "type": "http",
      "url": "https://multifamilyconstruction.loan/mcp"
    }
  }
}

Gemini CLI

Run this once. It writes .gemini/settings.json in the current project; pass --scope user for ~/.gemini/settings.json.
Gemini CLI configuration
gemini mcp add --transport http draw-schedule-mcp https://multifamilyconstruction.loan/mcp

Claude Desktop

Merge this into claude_desktop_config.json (macOS: ~/Library/Application Support/Claude/, Windows: %APPDATA%\Claude\), then restart Claude Desktop.
Claude Desktop configuration
{
  "mcpServers": {
    "draw-schedule-mcp": {
      "url": "https://multifamilyconstruction.loan/mcp"
    }
  }
}

Windsurf

Merge this into ~/.codeium/windsurf/mcp_config.json, then refresh MCP in Cascade. Windsurf remote servers use serverUrl, not url.
Windsurf configuration
{
  "mcpServers": {
    "draw-schedule-mcp": {
      "serverUrl": "https://multifamilyconstruction.loan/mcp"
    }
  }
}

Let your agent find its tools

Find servers like Draw Schedule MCP from your agent. Add Koskamo once to search the index for endpoints, access requirements, and client setup. Public discovery needs no key.

Do you run Draw Schedule MCP?

Prove ownership with a DNS record, a well-known file, or your Official MCP Registry entry, and your edits publish immediately. Proofs are re-checked weekly; admins can still hide or remove a listing.

Claim this listing